Happy Business Starts Here

468 Views
4 Comments

Please be advised that we are taking a scheduled maintenance window for rest.zuora.com between 6pm PT and 10pm PT on Thursday Oct 3rd, 2019. We will be performing a routine rotation of an internal certificate which handles traffic for rest.zuora.com.

Read more...

144 Views
0 Comments

Routine Maintenance Sandbox environments ONLY

 

From 11:00 AM to 12:00 AM PDT, 06 August 2019 EU SANDBOX
From 5:00 PM to 6:00 AM PDT, 07 August 2019 NA SANDBOX

Read more...

107 Views
0 Comments

In order to increase reliability and security, we will be conducting a network maintenance in our Performance Test (PT1) environment Wednesday, July 10 2019 at 8:00PM. API and UI functionality will be unavailable for a brief period during the maintenance window. We anticipate the actual impact time to be less than 2 minutes.

1516 Views
5 Comments

UPDATE: The maintenance window start time has been updated to 7:00PM PDT to 9:00PM PDT

 

In order to increase network capacity, security, and reliability we will be conducting a network maintenance in our US Production and Sandbox datacenter on Saturday, April 20, 2019 from 9:00PM PDT to 11:00PM PDT 7:00PM PDT to 9:00PM PDT.

 

API and UI functionality will be unavailable intermittently throughout the maintenance window as we transition in new capacity and network paths optimize. Pre-configuration and placement work has been completed in order to minimize traffic interruptions during the maintenance window. RevPro services will not be impacted.

 

A maintenance status message will be posted upon completion of the activity.

182 Views
0 Comments
1206 Views
0 Comments

Update on 3/20: This maintenance will be rescheduled to a later date TBD.

Read more...

513 Views
0 Comments
517 Views
0 Comments

We will be performing emergency maintenance to the Connect platform on 12/12/2018 from 9:00pm to 12:00am (midnight) Pacific.

Maintenance window extended to 12/13 1:00am Pacific

Read more...

3368 Views
13 Comments

We will be conducting a network maintenance in our US Production datacenter on Sunday November 11, 2018. API and UI transactions will be unavailable for up to 1 hour during the maintenance window. 

Read more...

4608 Views
15 Comments

 

REVISED: BOOMI SCHEDULED MAINTENANCE IN US FOR NETSUITE CONNECTOR ON 10/13/2018 FROM 7:00 UNTIL 11:00 UTC

Impacted Region: US customers on NetSuite Connector

Read more...

288 Views
0 Comments

 

Impacted Region: US Performance Test(PT1) Environment

 

We will be performing an urgent preventative maintenance of our Storage system. We are reserving the 4 hour window where most time is in validation, actual work time is approximately 30 minutes so we expect the downtime to be considerably less than our window.

Read more...

  • Maintenance
272 Views
0 Comments

Zuora Insights and Dashboard features will undergo maintenance on Saturday 09/15/2018 from 11:00PM - 11:59PM PT in the US Production environment only.

Read more...

286 Views
0 Comments

We will be doing a network infrastructure upgrade on our Production Copy Environments (Services) from 6:00 pm to 8:00pm PDT this evening, July 31, 2018.

Read more...

353 Views
0 Comments

Due to Amazon notification of maintenance in our AWS region, Zuora must perform a reboot on a subset of Production Copy Environments (Services) on Thursday, May 17th at 2:00 AM PDT.

Read more...

345 Views
0 Comments

Due to Amazon notification of maintenance in our AWS region, Zuora must perform a reboot of the following Production Copy Environments (Services) on Monday, May 7nd at 7:00 PM PDT.

Read more...

489 Views
0 Comments

Due to Amazon notification of maintenance in our AWS region, Zuora must perform a reboot of the following Production Copy Environments (Services) on Friday, March 2nd at 2:00 AM PDT.

Read more...

3040 Views
5 Comments

We have emergency maintenance scheduled for Saturday, February 10th, 2018 from 4:00pm until 8:00pm PDT

Read more...

  • Maintenance
337 Views
0 Comments

To improve reliability, processing capacity, and resiliency of our messaging queue systems, we are performing a scheduled maintenance in EU Production environment on Sunday, December 17th, 2017 from 6:00 PM PST until 8:00 PM PST.  
 
During this maintenance, there will be NO service interruption expected.
Read more...

705 Views
1 Comment

We will be upgrading our AWS load balancer for cluster for our Connect service from a Classic AWS Load Balancer to a Application Load Balancer (ALB). This will change the DNS routing of connect.zuora.com, and any app under *.apps.zuora.com, to the new load balancer. There will be no downtime during this changes as traffic will gradually transfer from the old load balancer to the new load balancer. There are no actions required on customer's side.

 

 

Thank you!

Read more...

927 Views
1 Comment

We are performing a scheduled maintenance in US Production environment on Sunday, November 19th, 2017 from 7:00 PM PST until 9:00 PM PST.
Read more...

  • Maintenance
1475 Views
4 Comments

We will be performing a maintenance on our Connect service on November 14th from 5pm until 6pm Pacific. During this time, there may be brief service interruption. This work is to upgrade to new infrastructure and service management of the Connect environment.

866 Views
1 Comment

We are performing our scheduled maintenance of the PT1 environment on November 12th.

Read more...

  • Maintenance
407 Views
0 Comments

We will be performing a scheduled maintenance of the PT1 environment on November 9th from 7pm PDT until 8pm PDT...

Read more...

  • Maintenance
1848 Views
4 Comments

Zuora will be making some changes to our IP Address pool for access to Zuora endpoints. Action may be required on your part to ensure you do not experience a disruption in service if you whitelist outgoing connections from your application.

Read more...

  • Maintenance
1274 Views
2 Comments

Confirm your use of TLS 1.1 or higher

 

Read more...

3297 Views
7 Comments

In order to improve security, increase operational efficiency and align our Certificate Authorities for Zuora Production endpoints, rest.zuora.com will be migrated to the same Certificate Authority as api.zuora.com and www.zuora.com

Read more...

  • Maintenance
409 Views
0 Comments

As a part of making our service more resilient, our technology teams will be performing a maintenance to increase network device capacity at our secondary and production data centers on the following schedule:

 

  • Secondary data center (PT environments): THURSDAY, MAY 4 18:00-19:00 PDT

 

  • Production data center (Production and Sandbox environments):  SATURDAY MAY 6 8:00-9:00 PD

 

A limited interruption of some existing connections is possible.

 

Thank you for your patience while we improve our services.

  • Maintenance
498 Views
0 Comments

UPDATE: This maintenance will be rescheduled to a later date and will not occur on April 22, 2017.

 

 

As a part of making our service more resilient, our technology teams will be performing a maintenance to increase network device capacity at our production datacenter.

 

We do not anticipate any interruption to the service.

 

Thank you for your patience while we improve our services.

  • Maintenance
490 Views
0 Comments

As a part of making our service more resilient, our technology teams will be performing a maintenance to replace a redundant power distribution unit at our non-production datacenter.

 

We do not anticipate any interruption to the service.

 

Thank you for your patience while we improve our services.

  • Maintenance
450 Views
0 Comments

As a part of making our service more resilient our technology teams will be performing emergency maintenance on our core network tier serving both Production and Sandbox environments.

 

We do not anticipate any interruption to the service but will be performing activities on redundant components serving live traffic.

 

Thank you for your patience while we improve our services.

  • Maintenance